Nehring, Micah 照片

Nehring, Micah

Dr

所属大学: University of Queensland

所属学院: School of Mechanical and Mining Engineering

邮箱:
m.nehring@uq.edu.au

个人主页:
http://researchers.uq.edu.au/researcher/1612

研究领域

Mine Planning Production Scheduling Optimisation Mathematical Programming In-Pit-Crusher-Conveyor (IPCC) Systems

近期论文

Nehring, M. and Cheng, X. (2016) An investigation into the impact of mine closure and its associated cost on life of mine planning and resource recovery. Journal of Cleaner Production, 127 228-239. doi:10.1016/j.jclepro.2016.03.162 Lawrence, Kurt and Nehring, Micah (2015) Market structure differences impacting australian iron ore and metallurgical coal industries. Minerals, 5 3: 473-487. doi:10.3390/min5030473 Salama, Abubakary, Nehring, Micah and Greberg, Jenny (2015) Evaluation of the impact of commodity price change on mine plan of underground mining. International Journal of Mining Science and Technology, 25 3: 375-382. doi:10.1016/j.ijmst.2015.03.008 Uren, Z. and Nehring, M. (2015) Development of Dozer Push Optimisation Software for Commodore Coal Mine. Journal of Research Projects Review, 4 1: 59-65. Smith, C. B., Nehring, M. and Bosompem, M. K. (2014) A critique of selective mining unit sizing at Century Mine to optimise productivity with dilution. Journal of Research Projects Review, 3 1: 63-68. Yap, A., Saconi, F., Nehring, M., Arteaga, F., Pinto, P., Asad, M. W. A., Ozhigin, S., Ozhigina, S., Mozer, D., Nagibin, A., Pul, E., Shvedov, D., Ozhigin, D., Gorokhov, D. and Karatayeva, V. (2013) Exploiting the metallurgical throughput-recovery relationship to optimise resource value as part of the production scheduling process. Minerals Engineering, 53 74-83. doi:10.1016/j.mineng.2013.06.005 Salama, Abubakary, Nehring, Micah and Greberg, Jenny (2013) Operating value optimization using simulation and mixed integer programming. International Journal of Mining, Reclamation and Environment, 28 1: 25-46. doi:10.1080/17480930.2013.768019 Nehring, M., Topal, E., Kizil, Mehmet S. and Knights, P. (2012) Integrated short- and medium-term underground mine production scheduling. Journal of The South African Institute of Mining and Metallurgy, 112 5: 365-378. Nehring, M., Topal, E. and Little, J. (2010) A new mathematical programming model for production schedule optimization in underground mining operations. Journal of the South African Institute of Mining and Metallurgy, 110 8: 437-446. Nehring, M., Topal, E. and Knights, P. (2010) Dynamic Short term production scheduling and machine allocation in underground mining using mathematical programming. Transactions of the Institute of Materials, Minerals and Mining, Section A: Mining Technology, 119 4: 212-220. doi:10.1179/1743286310Y.0000000001