徐德华 照片

徐德华

副教授

所属大学: 南京财经大学

所属学院: 国际经贸学院

邮箱:
xudehua@nufe.edu.cn

个人主页:
http://gmxy.nufe.edu.cn/info/1011/6348.htm

个人简介

理学博士学位,南京财经大学国际经贸学院副教授。

主要讲授课程 ◆电子商务案例分析、电子商务概论A、数据结构

主持课题 1、国家自然科学基金项目“非固定时长柔性周期维护调度问题的理论与算法”,2013.1-2015.12。 2、江西省自然科学基金项目“若干新型排序问题的高性能算法及其灵敏度分析”,2013.1-2016.12。 3、江西省教育厅青年科学基金项目“基于生产数据的微电子生产过程智能优化调度”,2011.1-2014.12。

专著 ◆徐德华. 车间运行与维护的集成调度理论. 武汉: 武汉大学出版社, 2015.

研究领域

◆资源优化配置(组合优化)

近期论文

1、Zhijun Xu, Dehua Xu. Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time. Journal of Scheduling 21 (2018) 461-482.

2、Dehua Xu, Long Wan, Aihua Liu, Dar-Li Yang. Single machine total completion time scheduling problem with workload-dependent maintenance duration. Omega-International Journal of Management Science 52 (2015) 101-106.

3、Zhijun Xu, Dehua Xu. Single-machine scheduling with preemptive jobs and workload-dependent maintenance durations. Operational Research 15 (2015) 423-436.

4、Dehua Xu, Aihua Liu, Dar-Li Yang. Mathematical programming models for competitive two-agent single-machine scheduling with flexible periodic maintenance activities. Arabian Journal for Science and Engineering 39 (2014) 3715-3722.

5、Dehua Xu, Dar-Li Yang. Makespan minimization for two parallel machines scheduling with a periodic availability constraint: Mathematical programming model, average-case analysis, and anomalies. Applied Mathematical Modelling 37 (2013) 7561-7567.

6、Dehua Xu, Min Liu, Yunqiang Yin, Jinghua Hao. Scheduling tool changes and special jobs on a single machine to minimize makespan. Omega-International Journal of Management Science 41 (2013) 299-304.

7、Dehua Xu, Yunqiang Yin. On single-machine scheduling with flexible maintenance activities. International Journal of Advanced Manufacturing Technology 56 (2011) 1139-1145.

8、Dehua Xu, Yunqiang Yin, Hongxing Li. Comments on "A note on minimizing maximum lateness in an m-machine scheduling problem with a learning effect". Applied Mathematics and Computation 217 (2010) 939-943.

9、Dehua Xu, Yunqiang Yin, Hongxing Li. Scheduling jobs under increasing linear machine maintenance time. Journal of Scheduling 13 (2010) 443-449.

10、Dehua Xu, Yunqiang Yin, Hongxing Li. A note on "scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan". European Journal of Operational Research 197 (2009) 825-827.

11、Dehua Xu, Zhenmin Cheng, Yunqiang Yin, Hongxing Li. Makespan minimization for two parallel machines scheduling with a periodic availability constraint. Computers & Operations Research 36 (2009) 1809-1812.

12、Dehua Xu, Kaibiao Sun, Hongxing Li. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan. Computers & Operations Research 35 (2008) 1344-1349.